Bond Measure W - 11/5/2024 Election
-
Measure W is a general obligation (GO) bond measure on the November 5, 2024, Presidential Election ballot. If approved by 55% of ballots cast, it will extend but not increase the district’s current tax rate to authorize $280 million to make critical renovations and improve schools and classrooms throughout the ¿´Æ¬ÊÓƵ Union School District. In addition, voter approval of Measure W will allow the district to qualify for up to $132 million in state matching funds.
Measure W ensures there will be full public disclosure of all spending. An independent Citizens’ Oversight Committee must review and report on all bond expenditures, and a third-party auditor must audit all bond expenditures. Measure W includes a specific list of projects on which bond funds may be spent. Measure W bond funds must be spent on ¿´Æ¬ÊÓƵ Union School District’s projects and cannot be taken by the state.
All registered voters in California will receive a vote-by-mail ballot. If you need to register to vote, you can register online at . Once you complete your ballot, sign your ballot envelope and simply drop your ballot in the mail—postage is prepaid—by November 5, 2024. If you need additional assistance or would like to drop off your ballot in person at a vote center or ballot drop box, please visit for more information.
We invite you to learn more about how Measure W will impact your child’s school. Click on your child’s school below to see specific project details.
Thank you for being a part of the ¿´Æ¬ÊÓƵ community and for your continued support in making our district the best place for our children to learn and grow.
Elementary Schools
-
Anza Elementary School
Built in: 1960 Current Enrollment: 693 1005 S. Anza Street, El Cajon www.cajonvalley.net/anza
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- Student Support Space
- Shade Structures
🟧 MODERNIZATION
- Demolish & Remodel Restrooms
- Replace Underground Sewer, Water and Storm Drain Systems
- Replace Interior Finishes (Ceilings, Walls, Surfaces & Flooring)
- Replace Door & Window Systems
- Patch & Paint Interior & Exterior Surfaces
- Replace Old, Antiquated Electrical Gear
- Replace site work to Comply with ADA Requirements
- Patch or Replace Roofing where needed
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
Avocado Elementary School
Built in: Current Enrollment: 571 3845 Avocado School Rd. www.cajonvalley.net/avocado
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- Student Support Space
- Shade Structures
🟧 MODERNIZATION
- Upgrade Restrooms
- Replace Underground Systems where needed
- Replace Interior Finishes (Ceilings, Walls & Flooring)
- Patch & Paint Interior & Exterior Surfaces
- Replace Site Work to Comply with ADA Requirements
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
Blossom Valley Elementary School
Built in: Current Enrollment: 530 9863 Oakmont Terrace, El Cajon www.cajonvalley.net/blossomvalley
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- Shade Structures
🟧 MODERNIZATION
- Upgrade Restrooms
- Replace Underground Systems where needed
- Replace Interior Finishes (Ceilings, Walls & Flooring)
- Patch & Paint Interior & Exterior Surfaces • Replace Site Work to Comply with ADA Requirements
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
Bostonia Global - Broadway Campus
Built in: Current Enrollment: 778 1390 Broadway, El Cajon www.cajonvalley.net/bostonia
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- Shade Structures
🟧 MODERNIZATION
- Upgrade Restrooms
- Replace Underground Systems where needed
- Replace Interior Finishes (Ceilings, Walls & Flooring)
- Patch & Paint Interior & Exterior Surfaces
- Replace Site Work to Comply with ADA Requirements
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
Chase Elementary School
Built in: Current Enrollment: 753 195 E. Chase Ave, El Cajon www.cajonvalley.net/chase
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- Shade Structures
🟧 MODERNIZATION
- Demolish & Remodel Restrooms
- Replace Underground Sewer, Water and Storm Drain Systems
- Replace Interior Finishes (Ceilings, Walls & Flooring)
- Replace Door & Window Systems
- Patch & Paint Interior & Exterior Surfaces
- Replace Old, Antiquated Electrical Gear
- Replace site work to Comply with ADA Requirements
- Patch or Replace Roofing where needed
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
Crest SchoolÂ
Built in: Current Enrollment: 269 2000 Suncrest Blvd, El Cajon www.cajonvalley.net/Crest
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- Shade Structures
🟧 MODERNIZATION
- Demolish & Remodel Restrooms
- Replace Underground Sewer, Water and Storm Drain Systems
- Replace Interior Finishes (Ceilings, Walls, Surfaces & Flooring)
- Replace Door & Window Systems
- Patch & Paint Interior & Exterior Surfaces
- Replace Old, Antiquated Electrical Gear
- Replace site work to Comply with ADA Requirements
- Patch or Replace Roofing where needed
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
EJE Academies Charter School
Built in: 1948 Current Enrollment 851 S Johnson Ave, El Cajon, CA 92020 www.ejeacademies.org
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION
🟦 NEW CONSTRUCTION-
Four (4) New TK/K Classrooms
-
One (1) New Afterschool/Flex Classroom
-
New Outdoor Kindergarten Play Area & Shade Structure
If approved by voters, Measure W will provide $7.5 Million toward EJE's kindergarten facility improvements. The final scope of work is dependent on EJE's contribution to the project.
-
-
Empower Academy
Built in: Current Enrollment: 21 165 Roanoke Rd., El Cajon www.cajonvalley.net/empower
DEVELOPMENT PLAN
🟧 MODERNIZATION
🟧 MODERNIZATION
- Upgrade Restrooms
- Replace Underground Systems where needed
- Replace Interior Finishes (Ceilings, Walls & Flooring)
- Patch & Paint Interior & Exterior Surfaces
- Replace Site Work to Comply with ADA Requirements
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
Flying Hills School of the Arts
Built in: Current Enrollment: 725 1251 Finch St., El Cajon www.cajonvalley.net/flyinghills
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- Theater
- Parking Lot
- Shade Structures
🟧 MODERNIZATION
- Demolish & Remodel Restrooms
- Replace Underground Sewer, Water and Storm Drain Systems
- Replace Interior Finishes (Ceilings, Walls, Surfaces & Flooring)
- Replace Door & Window Systems
- Patch & Paint Interior & Exterior Surfaces
- Replace Old, Antiquated Electrical Gear
- Replace site work to Comply with ADA Requirements
- Patch or Replace Roofing where needed
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
Fuerte Elementary School
Built in: Current Enrollment: 687 11625 Fuerte Dr, El Cajon www.cajonvalley.net/fuerte
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- New School Office Space (for improved security)
- Shade Structures
🟧 MODERNIZATION
- Demolish & Remodel Restrooms
- Replace Underground Sewer, Water and Storm Drain Systems
- Replace Interior Finishes (Ceilings, Walls, Surfaces & Flooring)
- Replace Door & Window Systems
- Patch & Paint Interior & Exterior Surfaces
- Replace Old, Antiquated Electrical Gear
- Replace site work to Comply with ADA Requirements
- Patch or Replace Roofing where needed
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
Jamacha Elementary School
Built in: Current Enrollment: 420 2962 Jamul Dr., El Cajon www.cajonvalley.net/jamacha
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- Student Support Space
- Shade Structures
🟧 MODERNIZATION
- Upgrade Restrooms
- Replace Underground Systems where needed
- Replace Interior Finishes (Ceilings, Walls & Flooring)
- Patch & Paint Interior & Exterior Surfaces
- Replace Site Work to Comply with ADA Requirements
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
Johnson Elementary School
Built in: Current Enrollment: 778 500 W. Madison Ave., El Cajon www.cajonvalley.net/johnson
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- New School Office/Classroom Building (for improved security)
- Shade Structures
🟧 MODERNIZATION
- Demolish & Remodel Restrooms
- Replace Underground Sewer, Water and Storm Drain Systems
- Replace Interior Finishes (Ceilings, Walls, Surfaces & Flooring)
- Replace Door & Window Systems
- Patch & Paint Interior & Exterior Surfaces
- Replace Old, Antiquated Electrical Gear
- Replace site work to Comply with ADA Requirements
- Patch or Replace Roofing where needed
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
Lexington Elementary School
Built in: Current Enrollment: 861 1145 Redwood Ave, El Cajon www.cajonvalley.net/lexington
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- Student Support Space
- Shade Structures
🟧 MODERNIZATION
- Upgrade Restrooms
- Replace Underground Systems where needed
- Replace Interior Finishes (Ceilings, Walls & Flooring)
- Patch & Paint Interior & Exterior Surfaces
- Replace site work to Comply with ADA Requirements
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
Madison Elementary School
Built in: Current Enrollment: 656 1615 E. Madison Ave., El Cajon www.cajonvalley.net/madison
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- Student Support Space
- Shade Structures
🟧 MODERNIZATION
- Demolish & Remodel Restrooms
- Replace Underground Sewer, Water and Storm Drain Systems
- Replace Interior Finishes (Ceilings, Walls, Surfaces & Flooring)
- Replace Door & Window Systems
- Patch & Paint Interior & Exterior Surfaces
- Replace Old, Antiquated Electrical Gear
- Replace site work to Comply with ADA Requirements
- Patch or Replace Roofing where needed
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
Magnolia Elementary School
Built in: Current Enrollment: 694 650 Greenfield Dr, El Cajon www.cajonvalley.net/magnolia
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- Shade Structures
🟧 MODERNIZATION
- Demolish & Remodel Restrooms
- Replace Underground Sewer, Water and Storm Drain Systems
- Replace Interior Finishes (Ceilings, Walls, Surfaces & Flooring)
- Replace Door & Window Systems
- Patch & Paint Interior & Exterior Surfaces
- Replace Old, Antiquated Electrical Gear
- Replace site work to Comply with ADA Requirements
- Patch or Replace Roofing where needed
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
Meridian Elementary School
Built in: Current Enrollment: 563 651 S. 3rd St., El Cajon www.cajonvalley.net/meridian
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- Student Support Space
- Shade Structures
🟧 MODERNIZATION
- Demolish & Remodel Restrooms
- Replace Underground Sewer, Water and Storm Drain Systems
- Replace Interior Finishes (Ceilings, Walls, Surfaces & Flooring)
- Replace Door & Window Systems
- Patch & Paint Interior & Exterior Surfaces
- Replace Old, Antiquated Electrical Gear
- Replace site work to Comply with ADA Requirements
- Patch or Replace Roofing where needed
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
Naranca Elementary School
Built in: Current Enrollment: 974 1030 Naranca Ave., El Cajon www.cajonvalley.net/naranca
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- Student Support Space
- Shade Structures
🟧 MODERNIZATION
- Demolish & Remodel Restrooms
- Replace Underground Sewer, Water and Storm Drain Systems
- Replace Interior Finishes (Ceilings, Walls, Surfaces & Flooring)
- Replace Door & Window Systems
- Patch & Paint Interior & Exterior Surfaces
- Replace Old, Antiquated Electrical Gear
- Replace site work to Comply with ADA Requirements
- Patch or Replace Roofing where needed
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
Rancho San Diego Elementary School
Built in: Current Enrollment: 543 12151 Calle Albara, El Cajon www.cajonvalley.net/rancho
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- Shade Structures
🟧 MODERNIZATION
- Upgrade Restrooms
- Replace Underground Systems where needed
- Replace Interior Finishes (Ceilings, Walls, & Flooring)
- Patch & Paint Interior & Exterior Surfaces
- Replace site work to Comply with ADA Requirements
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
Rios Computer Science Magnet School
Built in: Current Enrollment: 265 14314 Rios Canyon Rd., El Cajon www.cajonvalley.net/rios
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- Shade Structures
🟧 MODERNIZATION
- Demolish & Remodel Restrooms
- Replace Underground Sewer, Water and Storm Drain Systems
- Replace Interior Finishes (Ceilings, Walls, Surfaces & Flooring)
- Add Classroom Walls
- Replace Door & Window Systems
- Patch & Paint Interior & Exterior Surfaces
- Replace Old, Antiquated Electrical Gear
- Replace site work to Comply with ADA Requirements
- Patch or Replace Roofing where needed
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
Vista Grande Elementary School
Built in: Current Enrollment: 634 1908 Vista Grande Rd., El Cajon www.cajonvalley.net/vistagrande
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- Student Support Space
- Shade Structures
🟧 MODERNIZATION
- Upgrade Restrooms
- Replace Underground Systems where needed
- Replace Interior Finishes (Ceilings, Walls, & Flooring)
- Patch & Paint Interior & Exterior Surfaces
- Replace site work to Comply with ADA Requirements
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
W.D. Hall Elementary School
Built in: Current Enrollment: 603 1376 Pepper Dr., El Cajon www.cajonvalley.net/hall
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- Student Support Space
- Shade Structures
🟧 MODERNIZATION
- Demolish & Remodel Restrooms
- Replace Underground Sewer, Water and Storm Drain Systems
- Replace Interior Finishes (Ceilings, Walls, Surfaces & Flooring)
- Replace Door & Window Systems
- Patch & Paint Interior & Exterior Surfaces
- Replace Old, Antiquated Electrical Gear
- Replace site work to Comply with ADA Requirements
- Patch or Replace Roofing where needed
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
Middle / High Schools
-
Bostonia Global - Emerald Campus
Built in: Current Enrollment: 505 1221 S. Emerald Ave., El Cajon www.cajonvalley.net/bostonia
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- Shade Structures
🟧 MODERNIZATION
- Demolish & Remodel Restrooms
- Replace Underground Sewer, Water and Storm Drain Systems
- Replace Interior Finishes (Ceilings, Walls, Surfaces & Flooring)
- Replace Door & Window Systems
- Patch & Paint Interior & Exterior Surfaces
- Replace Old, Antiquated Electrical Gear
- Replace site work to Comply with ADA Requirements
- Patch or Replace Roofing where needed
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
¿´Æ¬ÊÓƵ Middle School
Built in: Current Enrollment: 937 550 E. Park Ave., El Cajon www.cajonvalley.net/cajonvalley
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- Special Education Classroom Facility
- Shade Structures
🟧 MODERNIZATION
- Upgrade Restrooms
- Replace Underground Systems where needed
- Replace Interior Finishes (Ceilings, Walls & Flooring)
- Patch & Paint Interior & Exterior Surfaces
- Replace Site Work to Comply with ADA Requirements
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
Greenfield Middle School
Built in: Current Enrollment: 726 1495 Greenfield Dr., El Cajon www.cajonvalley.net/greenfield
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- Student Support Space
- Shade Structures
🟧 MODERNIZATION
- Demolish & Remodel Restrooms
- Replace Underground Sewer, Water and Storm Drain Systems
- Replace Interior Finishes (Ceilings, Walls, Surfaces & Flooring)
- Replace Door & Window Systems
- Patch & Paint Interior & Exterior Surfaces
- Replace Old, Antiquated Electrical Gear
- Replace site work to Comply with ADA Requirements
- Patch or Replace Roofing where needed
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
Hillsdale Middle School
Built in: Current Enrollment: 1,466 1301 Brabham St., El Cajon www.cajonvalley.net/hillsdale
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- Gymnasium
- Locker Rooms / P.E. Building
- Shade Structures
🟧 MODERNIZATION
- Upgrade Restrooms
- Replace Underground Systems where needed
- Replace Interior Finishes (Ceilings, Walls & Flooring)
- Patch & Paint Interior & Exterior Surfaces
- Replace site work to Comply with ADA Requirements
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
Los Coches Creek Middle School
Built in: Current Enrollment: 512 9669 Dunbar Lane, El Cajon www.cajonvalley.net/loscochescreek
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- Shade Structures
🟧 MODERNIZATION
- Upgrade Restrooms
- Replace Underground Systems where needed
- Replace Interior Finishes (Ceilings, Walls, & Flooring)
- Patch & Paint Interior & Exterior Surfaces
- Replace site work to Comply with ADA Requirements
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)
-
Montgomery Middle School
Built in: Current Enrollment: 919 1570 Melody Ln., El Cajon www.cajonvalley.net/montgomery
DEVELOPMENT PLAN
🟦 NEW CONSTRUCTION 🟧 MODERNIZATION
🟦 NEW CONSTRUCTION
- New Classrooms
- Shade Structures
🟧 MODERNIZATION
- Demolish & Remodel Restrooms
- Replace Underground Sewer, Water and Storm Drain Systems
- Replace Interior Finishes (Ceilings, Walls, Surfaces & Flooring)
- Replace Door & Window Systems
- Patch & Paint Interior & Exterior Surfaces
- Replace Old, Antiquated Electrical Gear
- Replace site work to Comply with ADA Requirements
- Patch or Replace Roofing where needed
- Security Upgrades (Security Cameras, Keyless Entry, Fencing)